What building stairs actually takes
Every guide starts with riser math: total rise, number of steps and tread depth. Then you cut stringers, set them level, attach treads and risers and build a landing pad.
According to Trex Academy, a 4 ft wide, 4 riser stair takes two people 12 to 16 hours, before the railing or the pad.
The tools on the list
DIY guides list 11 to 18 tools, including a framing square, stair gauges, a circular saw and a jigsaw.
Where most DIY stairs go wrong
One uneven step. Decks.com notes that steps should vary only slightly in height, and a stair that misses can fail inspection.
The other way
Order a finished stair. It shows up on a pallet with treads, fascia and the landing done. Carry it to the door, check level and stack the landing on.
Side by side

